Full Commercial Refurbishment
The Job
The following job involved consisted of firstly Rendering the entire Building. The existing Render was outdated and cracking so we replenished this with a Modern Scratch Render System. We also sprayed all the Internal/External Window Frames as well as the existing Roller Shutters. As the Window Frames were anodised, we applied a 2k etch primer, then applied a 2k Paint in Anthracite Grey. This saved the Client thousands of pounds and ultimately, due to our extensive preparation, achieved the same finish as factory fitted frames.